I've worked on your dollhouse this weekend and have made a lot of progress!
Over the last couple of weeks I have been doing some prep work: painting the windows, doors and doorways.
On Saturday all the pieces were ready to go so I could start to put it together.
I started by laying the first floor roof on top of the floor and drew where all the walls would be. I then drill holes into both the ceiling and floor at the same place so the walls could later connect to both.
Then I started to assemble the walls. The first one was the front wall where the porch is.
Then the living room walls, then dining room and then the kitchen.
The stairs and the door going to the basement were hard!
After I figured out the stairs then I was ready to start on the doorways between the rooms.
So now all the walls are in and the doorways. I still have to put trim on and touch up paint inside.
And then I'll need to work on the porch!